EVLA2006.12-3

Time: 2006 December 18

Duration: 1 week

Location: NRAO-AOC, Socorro, NM USA

Participants:

Meeting locations: Week of December 18, 2006

Testing Spreadsheet

Testing Materials

Test Data

Project Date Array Band Description AIPS CASA
AT16625jul94B X (32 MB)VLA continuum polarimetry (SS)
AT16625jul94B C (28 MB)VLA continuum polarimetry (SS)
AS649jan-feb99- HI rotating galaxy (SS)
/home/habanero/cjc/linux/synth06/data/vla_spline dir
n2403.readme
BT047xxxxx -X VLBA phase reference experiment (SS)
/home/habanero/cjc/linux/synth06/data/vlba_phaseref dir
READ.ME
AM858 17mar06AX (11 MB) VLA Continuum, Fast-switchingAM858.aipslog
AM858 17mar06AK (18 MB) VLA Continuum, Fast-switchingAM858.aipslog
AR603 10jul06B X (35 MB)VLA Continuum, Fast-switchingAR603.aipslog20060326 26mar06-LVLA spectral line (3C84)
AL586_1,2,3,4,5 29mar03DL (652 MB) VLA galactic HI (with RFI)AL586A.aipslog
AL586_6,7,8,9 31mar03DL VLA galactic HIAL586B.aipslogNGC592113apr95X L (35 MB)HI rotating galaxy-ngc5921_regression.py
AP31419may95X K (240 MB)Galactic NH3-ngc7538_regression.py
AS75826apr03X K (630 MB)Galactic NH3-g192_regression.py
anything else for testing out calibration facilities
ExecBlock3SimTestW (92 MB)ALMA simulated/Data flow test-ExecBlock3.py
G067 (GG TAU)PdBITestW (92 MB)ALMA simulated/Data flow test-exportuvfits
Note: (SS) indicates a data set used for the summer school. Please pay special attention to these.

ALMA2006.12 Results

Results were reported all week and captured in the spreadsheet at: Test Reports In addition, a report is being prepared by Michael Rupen. The CASA view summary at the closeout meeting is available at: Several closeout summaries are included below:

For any questions: Contact: casareq@nrao.edu